BackIndex Page
Ioncore Industrial Power Plants | Magnetic Inertia Energy Systems
IONCORE | Magnetic Inertia Energy Systems

Decentralized Power at Building, Campus & Factory Scale

Patent-pending magnetic inertia units engineered for sustained output, ultra-low noise, and adaptive controls. The platform spans condo, commercial, and factory-grade deployments with integrated cooling, storage, and redundancy. All figures represent internal test statistics; field pilots are pending.

Fast Load Response

<120 mssurge response
Stabilizes critical loads during transients.

Operational Efficiency

~92%round-trip equivalent
Observed in controlled hardware tests.

Acoustic Profile

<55 dBat 10 m
Quiet, building-integrated operation.

Product Portfolio & Scale

Model C — Condo

Ioncore C (Condo / Mid-rise)

  • Daily Output: ~470 kWh
  • Storage: 300 kWh Li-ion
  • Self-Sufficiency: 85–95% (usage dependent)
  • Noise: <40–50 dB typical
Use Cases: Condo cores, lobby/EV, essential services
Model X — Commercial

Ioncore X (Commercial / Campus)

  • Daily Output: ~1,900 kWh
  • Storage: 1,000 kWh bank
  • Redundancy: Dual-core failover
  • Grid Mode: Island / Tie-in / Black Start
Use Cases: Towers, hospitals, data edges, retail hubs
Model F — Factory

Ioncore F (Factory / Industrial)

  • Peak Output: ~5 MW per housing
  • Daily Output: ~85–95 MWh
  • Storage: 20 MWh (Li-ion + solid-state)
  • Redundancy: Dual inertia chambers + N+1 subsystems
Use Cases: Automotive, metals, logistics, microgrids

Note: Operational figures are based on internal hardware testing and simulation. Real-world performance may vary during pilot deployments.

Observed Performance (Internal Tests)

Continuity & Stability

  • 72+ hours non-stop runtime observed
  • Energy recovery factor >88%
  • Autonomous recalibration ~every 4 hours

Thermal & Acoustic

  • Integrated liquid cooling + cryogenic options
  • Thermal stability under heavy load
  • <55 dB exterior at 10 m (factory housing)

Intelligence

  • Predictive load tuning (ML models)
  • Adaptive surge response <120 ms
  • SCADA & remote supervisory control

Key Engineering Systems

Magnetic Bearings & Flywheels

  • Hybrid ceramic / magnetic bearings for ultra-low drag
  • Carbon-composite rotors in vacuum chambers
  • Tuned mass damping & vibration isolation
  • Ballistic-rated liners for rotor containment
Factory model est. subsystem cost: $4.2M

Electromagnetic Drive & Harvest

  • High-density copper coils; superconducting option
  • 3,000–5,000 RPM operating window
  • Dual-core redundancy with live failover

Cryogenic Cooling Expansion

  • Primary Cryo Loop: LN₂ / LHe for superconducting coils
  • Secondary Loop: Glycol / fluorocarbon for inverters, bus bars, chambers
  • Phase-Change Buffers: Surge absorption tanks
  • Safety: O₂ monitoring, vent stacks, auto nitrogen refill
Factory model est. cryo subsystem: $2.5–4.5M

Energy Storage & Power Electronics

  • Li-ion (long duration) + solid-state (surge) hybrids
  • Smart BMS (cell-level predictive balancing)
  • MV switchgear (10–15 kV), N+1 inverters/rectifiers
  • Island, grid-tie, and black-start modes

Bill of Materials – Highlights (by Model)

Subsystem Condo (C) Commercial (X) Factory (F)
Magnetic bearings / flywheels 10 bearings, 4 rotors (15 kg) 20 bearings, 6 rotors (50 kg) 40 bearings, 8 rotors (500 kg)
Electromagnets (drive/harvest) 5 modules 8 modules 24 modules
Cooling Liquid loop + radiators Dual loops + radiators Cryo primary + secondary loop + radiators
Storage 300 kWh Li-ion 1,000 kWh Li-ion 20 MWh (Li-ion + solid-state)
Power electronics 3-phase inverter, PLC N+1 inverter bank, PLC/SCADA MV switchgear, N+1 inverter/rectifier stacks
Housing & acoustics Acoustic enclosure Noise-damped frame Industrial housing with mezzanine & crane access

Detailed line-item BOM available upon NDA for partners and pilot customers.

Pricing & Economics (Indicative)

Ioncore C — Condo

  • Estimated Build Cost: ~$165k
  • Indicative MSRP (installed): ~$229k
  • Gross Margin: ~28%
  • ROI: ~6–7 years (usage & tariff dependent)

Ioncore X — Commercial

  • Estimated Build Cost: ~$328k
  • Indicative MSRP: ~$455k
  • Gross Margin: ~28%
  • ROI: ~4.5–6 years

Ioncore F — Factory

  • Estimated Build Cost: ~$21.2M
  • Indicative MSRP: ~$29.0M
  • Gross Margin: ~27%
  • Payback: ~4–5 years (industrial OPEX deltas)

All pricing is indicative and subject to scope, incentives, and supply conditions. Field performance to be verified during pilots.

Deployment Roadmaps

Condo (C)

  • Design & interconnect: 4–6 weeks
  • Procurement & build: 8–10 weeks
  • Install & commission: 3–4 weeks
Typical total: 16–20 weeks

Commercial (X)

  • Site modeling & permits: 6–8 weeks
  • Build & FAT: 12–16 weeks
  • Site install & SAT: 4–6 weeks
Typical total: 22–30 weeks

Factory (F)

  • Engineering & grid studies: 10–12 weeks
  • Subsystem fab & integration: 24–32 weeks
  • Install, commission, ramp: 10–14 weeks
Typical total: 44–58 weeks

Why Ioncore

Resilience First

Island operation, black-start capability, and dual-core redundancy (X/F) make outages survivable with minimal operational disruption.

Predictive Intelligence

ML-trained models forecast demand and auto-tune RPM, storage dispatch, and cooling to minimize loss and extend system life.

Quiet, Compact, Local

Acoustic dampening and compact housings enable placement in buildings, campuses, and factory bays without external structures.

Important Notes

  • Technology is patent-pending and currently untested in live field deployments. Data herein reflects internal lab hardware tests and simulations.
  • All performance, cost, and ROI figures are estimates and will vary by site, tariff, regulation, and usage profile.
  • Detailed engineering packages, protection studies, and conformance documentation are available under NDA for pilot partners.

Partner, Pilot, or Procure

Next Steps

  • Request the technical whitepaper & product SOO
  • Share site load profiles for custom modeling
  • Scope a pilot with measurement & verification

Contact

Email: ioncoreenergy@gmail.com
Subject: Ioncore – Pilot Inquiry

We prioritize healthcare, data, industrial, and multifamily pilot sites.

Schedule a pilot briefing
Ioncore Energy Ioncore Energy Magnetic Inertia Systems